Saturday, September 9, 2017

Completed Projects page 42

bedframe installation
Bed complete
dirty air conditioner coils
cleaned
broken wood floor panels
 area made safe
debris in front yard
debris removed
stacked neatly
weeds on side of house
weeds removed
rusty window bars 1
rusty window bars 2
bars painted 1
bars painted 2
wood door before
after
cracked sidewalk before
cracks sealed
bathroom fixture replacement
new fixture installed


Saturday, August 26, 2017

Completed Projects page 41

Deck after cleaning ( I use non toxic chemicals)

before cleaning

front porch before

prep deck / organic cleaning prior to staining

deck stained/ painted

broken arm rest on chair

repaired

deck railing before painting

after painting

deck steps before

after


front deck rails before sanding and painting

after

window trim before

after

defective light bulb, bathroom vanity

bulb replaced- working

no lock on door

new lock installed

broken concrete causing leak to basement

concrete broken out

new concrete installed- no leaks- debris removed as well

toilet bowl continous leaking

new hardware installed- no longer leaking

Saturday, August 12, 2017

Completed Projects page 40

heavy duty landscaping

nicely landscaped

side of house / shrubs

shrubs tamed
broken dryer vent

new vent installed
shifted cable- weight set

cable re-aligned
rotted out brass plumbing

new brass pipes hand cut /installed
plaster wall / before picture frame

picture frame installed into plaster wall
tree outgrowing deck

cut deck to give tree room
missing shingle

shingle put back into place